Roof Inspections & Testing

Comprehensive diagnostic services for complete roofing systems.
LEARN MORE >

Facade Inspections & Testing

Full-service facade testing for commercial building envelopes.
LEARN MORE >

Window / Glazing Testing & Diagnostics

Complete professional inspections for windows and glazing systems.
LEARN MORE >

Air & Water Leak Diagnostics

Advanced air and water leak analysis for informed decision making.
LEARN MORE >

Whole Building Air Leakage Testing

Thorough air barrier testing for new construction and existing buildings.
LEARN MORE >

Electrical Testing

Non-destructive electrical testing for safety and insurance requirements.
LEARN MORE >

E

New Construction Solutions

Maximize your building envelope performance at every stage of construction, from spec to completion.
View Packages >

E

Existing Construction Solutions

Optimize the lifespan of your existing building envelope with routine maintenance solutions.
View Packages >

E

Specialty Solutions

Choose from a range of specialty solutions, customized for your unique building envelope needs.
View Packages >

Chamber Testing of Building Under Construction

In April of 2015, we performed chamber testing of a building, during construction, following ASTM E1186 Sections 4.1.6 (using smoke) and 4.1.7 (using liquids).


The contractor applied a spray air barrier on the face of the masonry block walls and the building owner was concerned that the material wasn’t applied thickly enough.    We built our testing chamber on the exterior of the wall to examine a small portion of the completed wall:

 

Small pin holes were visible throughout the tested assembly:

 

Utilizing theatrical smoke, there didn’t appear to be much air movement around these small pin holes. However, when a liquid solution was applied to the tested surface, air movement became very evident.

The chamber was very helpful in demonstrating that the air barrier had not been applied thickly enough to totally eliminate all potential leakage sites.