Roof Inspections & Testing

Comprehensive diagnostic services for complete roofing systems.
LEARN MORE >

Facade Inspections & Testing

Full-service facade testing for commercial building envelopes.
LEARN MORE >

Window / Glazing Testing & Diagnostics

Complete professional inspections for windows and glazing systems.
LEARN MORE >

Air & Water Leak Diagnostics

Advanced air and water leak analysis for informed decision making.
LEARN MORE >

Whole Building Air Leakage Testing

Thorough air barrier testing for new construction and existing buildings.
LEARN MORE >

Electrical Testing

Non-destructive electrical testing for safety and insurance requirements.
LEARN MORE >

E

New Construction Solutions

Maximize your building envelope performance at every stage of construction, from spec to completion.
View Packages >

E

Existing Construction Solutions

Optimize the lifespan of your existing building envelope with routine maintenance solutions.
View Packages >

E

Specialty Solutions

Choose from a range of specialty solutions, customized for your unique building envelope needs.
View Packages >

Air Barrier Test of an Army Corps Building

Building Envelope Allies just performed an air barrier test of a 37,000 sf building for the Army Corps.  This building has 2 sections:  an office area and a warehouse area, which can often complicate the air barrier test because warehouse areas are much more difficult to test and maintain a minimal amount of air leakage.

 

Air Barrier Test Concerns

First, the building has a warehouse and an office section and there were concerns that the warehouse area would not be sealed tightly due to the construction type, which is often the case.  The second concern was the building’s standing seam metal roof. The client was not convinced that they could get the roof sealed tightly.

 

Building Envelope Allies used six fans to test the building (both the office and warehouse areas). The building did not pass the test on the first run, though it was close. After some adjustments and tweaking, the air leakage was easily reduced and the building was brought into compliance.